Solar Batteries in Pakistan: Lithium vs Tubular and How to Size One

The most oversold and worst specified part of a solar system. How to size a bank from a backup list, why rated capacity is not usable capacity, and when storage genuinely pays.

Asia Engineers
4 min read
Updated 24 September 2026
Rooftop solar panels mounted on an aluminium mounting structure

The short version

  • Size a battery against a defined backup list, never against the whole house. That single discipline decides whether the budget survives.
  • Lithium (LiFePO4) costs more on day one and usually less per usable cycle. Tubular lead-acid costs less up front and gives you less usable energy for longer-term maintenance.
  • Rated capacity is not usable capacity. Depth of discharge is where most quotations mislead.
  • Under net billing, storage stopped being a comfort purchase and became an arithmetic one — but only if you have real evening load.
  • Fusing, isolation and ventilation are not optional extras. They are the difference between a battery bank and a fire.

Batteries are the most oversold and most badly specified part of a solar system in Pakistan. They are also the part that has changed the most since the 2026 net billing rules landed. Here is how to size one properly, and how to read a battery quotation without being taken for a ride.

How do I work out what size battery I need?

Short answerList only the circuits that genuinely must stay live during an outage. Add up their wattage, multiply by the number of hours you want them running, and that is the energy you must store. Then divide by the usable depth of discharge of the battery chemistry to get the nominal size you need to buy. Do not start from the house, start from the list.
WORKED EXAMPLE — YOUR OWN LIST WILL DIFFER WHAT MUST STAY ON LOAD HOURS ENERGY Lights and fans 300 W 4 h 1.2 kWh Internet and TV 150 W 4 h 0.6 kWh Refrigerator (average draw) 150 W 4 h 0.6 kWh One inverter air conditioner 900 W 4 h 3.6 kWh Energy you must store 6.0 kWh Now allow for usable depth of discharge 6.0 kWh ÷ 0.8 ≈ a 7.5 kWh nominal bank — before any allowance for ageing
A worked example, not your answer. Change the list and the hours and the number moves — which is exactly why a phone quotation for 'a good battery' means nothing.

Notice what happened at the bottom of that example. Six kilowatt hours of actual demand became roughly seven and a half kilowatt hours of battery to buy, because you cannot use every drop of a battery’s rated capacity without ruining it. That gap is where most quotations quietly fail, and where most disappointment comes from three months after commissioning.

Two more things to hold in mind. Air conditioning dominates any backup list it appears on, so decide honestly whether you need one running or whether fans will do. And a battery sized for four hours is not sized for eight — doubling the hours doubles the bank.

Free, no obligation

Tell us your backup list and we will size the bank

Send us the circuits that must stay live and for how long. You will get a battery size, a chemistry recommendation and an honest view on whether storage is worth it for your house at all.

We use your details only to answer this enquiry. No lists, no resale, no cold calls afterwards.

Lithium or tubular lead-acid?

Both are sold widely in Pakistan and both have a legitimate place. The difference is not quality in the abstract, it is what you are optimising for.

Lithium (LiFePO4)Tubular lead-acid
Price on day oneHigherLower
Usable share of rated capacityMost of itConsiderably less
Cycle lifeLongShorter
Weight and footprintLight, compactHeavy, bulky
MaintenanceNonePeriodic, and it matters
VentilationNormal room ventilationNeeds a properly ventilated location
Best whenYou will keep the system for yearsThe budget is genuinely fixed today

For most households buying in 2026, lithium is the sensible default. The honest exception is a buyer whose budget is hard-capped now and who understands they are accepting a shorter life and real maintenance in exchange. We will quote either, and we will tell you which one we would put in our own house.

Why depth of discharge decides everything

A battery’s rated capacity is a laboratory number. What you can actually take out of it, repeatedly, without destroying its life, is a fraction of that. Drawing a lead-acid bank too deep shortens its life dramatically. Lithium tolerates much deeper discharge, which is why a physically smaller lithium bank can deliver the same usable energy as a far larger lead-acid one.

This is why comparing two quotations on rated kilowatt hours alone is meaningless. Ask every supplier the same question: how many usable kilowatt hours does this give me, and at what depth of discharge? A supplier who cannot answer that is quoting a price, not a design.

Do batteries actually pay under net billing?

Under the old net metering arrangement, a surplus unit exported to the grid came back at the same value, so there was almost no financial reason to store it. Batteries were bought for comfort during load shedding, and that was fine.

Net billing changed the arithmetic. Exported units are now credited at a regulated rate well below the retail tariff, while the units you buy back after sunset still cost the full retail price. Storing a unit rather than selling it captures that spread. We explained the mechanism in net metering to net billing.

That said, this is not a universal yes. If nearly all your consumption happens while the sun is up, a battery mostly sits there being expensive. The deciding factor is your evening load, which is why we read six months of bills rather than one, and why we sometimes tell people not to buy a battery at all.

Not sure whether a battery is worth it for your house?

Send your last three bills and tell us roughly what runs after sunset. We will give you a straight yes or no.

The safety work a cheap quotation removes

Battery systems store a great deal of energy in a small space. The installation details that keep that safe are invisible, unglamorous, and the first thing to disappear when someone is competing on price.

  • Correctly rated DC fusing and isolation — so a fault can be cleared and the bank can be safely disconnected.
  • Cable sized for the real current — battery circuits carry high currents at low voltage, which is exactly where undersized cable overheats.
  • A suitable location — ventilated, dry, temperature-sensible, and not a cupboard chosen because it was convenient.
  • Labelling and isolation points — so whoever works on it in five years knows what they are touching.

Ask to see these items itemised. If the quotation says “battery and accessories”, you do not have a specification, and the same pattern shows up across the rest of the system — which we covered in what a solar system really costs.

Solar batteries: questions people actually ask

How do I work out what size battery I need?
Write down only the circuits that must stay live during an outage, add up their wattage, multiply by the hours of backup you want, and that gives you the energy you must store. Then divide by the usable depth of discharge of the battery type to get the nominal size. Sizing against the whole house instead of a backup list is the most common and most expensive mistake.
Lithium or tubular lead-acid, which is better?
Lithium iron phosphate gives a longer cycle life, deeper usable capacity, lighter weight and no maintenance, at a higher price on day one. Tubular lead-acid costs less up front but has a shorter life, needs ventilation and periodic maintenance, and gives you less usable energy per rated kilowatt hour. For most households lithium now works out cheaper per usable cycle.
Why does depth of discharge matter?
Because a battery's rated capacity is not all available to you. Drawing a lead-acid bank down too far shortens its life dramatically, so only part of it is usable in practice. Lithium tolerates deeper discharge, which is why a smaller lithium bank can deliver the same usable energy as a much larger lead-acid one.
Do batteries make financial sense under net billing?
They make far more sense than they did under net metering. Exported electricity now earns a regulated rate well below the retail tariff, so a unit stored and used after sunset is worth considerably more than the same unit sold. Whether the arithmetic works for you depends on how much of your load sits in the evening.
What safety work should a battery installation include?
Correctly rated DC fusing and isolation, a battery location with adequate ventilation and temperature control, cable sizing that suits the current involved, and clear labelling and isolation points for anyone who has to work on it later. These items are the first thing a cheap quotation removes and the last thing you want missing.

The bottom line

Start from the backup list, not the brochure. Insist on usable kilowatt hours rather than rated ones. Choose the chemistry deliberately rather than by price alone. And make sure the boring safety items are on the page. Do that and a battery is a sound investment under the current rules. Skip it and you will buy one twice.

One bill is all we need

Get a battery sized properly for your house

A free survey, a defined backup list, usable kilowatt hours stated in writing, and a recommendation you can hold us to. If you do not need storage, we will say so.

We use your details only to answer this enquiry. No lists, no resale, no cold calls afterwards.

Asia Engineers — engineering desk

We design, manufacture and install solar systems, cranes and material handling, electromechanical works and steel structures from Lahore. Everything here is written by the people who do the surveys, not by a marketing agency. Where a rule or a price is likely to change, we say so rather than pretending it is fixed.

WhatsApp us